Albums: WA7DUH And WB7CNV Tower Construction

WA7DUH And WB7CNV Tower Construction

Photo essay of tower project at the station of Linda WB7CNV and Steve WA7DUH. They live just outside of the Richland and West Richland city limits in Benton County. Project is to initially erect a 65 ft guyed tower, but to design it for 75 ft or higher. Benton County has an ordinance controlling "communications facilities" (BCC 11.65) which includes "communication towers and antennas." Many of the requirements are exempted for amateur radio towers and antennas not exceeding 65 ft.
138 images Submitted by WA7DUH Steve St... on Sat, 08/04/2012 - 11:19am

P1010686 (Custom).JPG

Prior to tower project, 44 ft fiberglass poles hold up a G5RV non-resonant dipole at the WB7CNV/WA7DUH residence.

0 / 0
Uploaded on 08/04/2012 - 11:21am by WA7DUH Steve St... 1247 visits

P1020395.JPG

Rebar grid construction for tower base.

0 / 0
Uploaded on 08/04/2012 - 11:39am by WA7DUH Steve St... 1158 visits

P1020396.JPG

Diagonal rebar wires are used to keep the grid square.

0 / 0
Uploaded on 08/04/2012 - 11:39am by WA7DUH Steve St... 947 visits

P1020398.JPG

Linda WB7CNV cut about 450 tie wires for the tower base and 3 guy station rebar cages.

0 / 0
Uploaded on 08/04/2012 - 11:39am by WA7DUH Steve St... 1026 visits

P1020399 (Medium).JPG

Tower base hole as specificed will be 4ft x 4ft x 5ft deep. 1st 6 inches is gravel and sand for moisture drainage, followed by 4 cement blocks that hold the bottom rebar grid up into the poured concrete. Tower base legs stick down into the gravel/sand (below the concrete so as to drain any water that may form in the tower legs. Another rebar grid will be embedded in the poured concrete 42 inches above the bottom grid seen in the picture.

0 / 0
Uploaded on 08/04/2012 - 11:39am by WA7DUH Steve St... 887 visits

P1020402.JPG

The engineered specs call for #7 rebar (7/8"). Are we holding up a 2000 ft TV station antenna?

0 / 0
Uploaded on 08/04/2012 - 11:39am by WA7DUH Steve St... 974 visits

bentonCoHamExemption.jpg

Benton County exemption from Benton County Code (BCC) 11.65 Communications Facilities that is really aimed at commercial installations such as TV/Radio stations or cell towers. However, this exemption did not remove the requirement for a building permit, structural analysis and original drawings with original (not copy) signature/stamp of Wash. State licensed Professional Engineer. Tower manufacturer's analysis and drawings were not acceptable (not original or Wash. licensed).

Also, county building dept. wanted to impose most of the requirements of BCC 11.65 anyway "for your and neighbor's protection". We battled several issues.

0 / 0
Uploaded on 08/04/2012 - 6:16pm by WA7DUH Steve St... 992 visits

P1020388.JPG

One of three rebar cages for guy stations. Each guy station consists of a reinforced block of concrete 6ft x 4ft x 2ft high buried 4 ft below grade. That long 3/4 in rod is what the guy lines are tied to, and is buried in the concrete block. Each rod will sustain at least 8000 lbs of pull, which is about 4X overkill, since the worst case forces with an 88 mph wind is calculated to be 1000 lbs. Building code in Benton Co. requires survival of 88 mph winds.

0 / 0
Uploaded on 08/04/2012 - 6:44pm by WA7DUH Steve St... 904 visits

P1020389.JPG

0 / 0
Uploaded on 08/04/2012 - 6:44pm by WA7DUH Steve St... 936 visits

P1020391.JPG

The guy rods have 6 x 6 x 1/2 in steel plates to keep them from pulling out of the concrete guy station blocks. Picture shows drilling the 3/4 in holes for the rods. I need a slower turning drill press.

0 / 0
Uploaded on 08/04/2012 - 6:44pm by WA7DUH Steve St... 930 visits